THANK YOU for an amazing campaign! 💚 You can still pick up many items individually in the Pre-Order Store - and Python is available to unlock there as well!!
After two successful enamel pin campaigns, the Short Circuit bot boards are BACK with both a third pin installment and a soft new twist in the mix: a PLUSH version of Byte to hold and help you relax!
Technology is far from the antithesis of the natural world. We look to nature for design, fashioning aircraft in accordance with the dynamics of birds and solar panels after the scales on a butterfly’s wings. The aesthetic of Short Circuit carries on in this tradition, illustrating animals and other elements of the natural world in the style of Printed Circuit Boards (PCB) and bringing them into your lives as comforting robot companions!
The series is called Short Circuit as these little robots don't quite function as intended, but they put their whole electronic hearts into their tasks regardless. Conceptually, the bot-board pins function as personality chips for the robots!
Short Circuit 1.0 saw to the production of bot-boards in four Unit Lines: Earth, Fire, Water, and Air featuring ambassador robots Byte, Hex, Torrent, and Python along with additional units Malware and Mozzy.
Short Circuit 1.1 (Spooky Circuit) added Unit Line: Void featuring ambassador robot Remnant and additional robot units Defrag and Decomm.
Which brings us to the aim of this campaign: Short Circuit 1.2 (Soft Circuit) will seek to add Unit Line: Light featuring ambassador robots Hash and Heap - along with the first plush incarnations of the ambassador robots, beginning with Byte!
Softwere is a 2" gold plated, hybrid enamel pin in the colorway of Unit Line: Earth. Miss the first 48 hour window? Don't fret! This dashing bot-board is also available to purchase through pledges and campaign add-ons.
Returning backers will receive a FREE 4" selective holographic vinyl sticker of Softwere, as a thank you for continuing to show up for these lil friends. <3
If we manage to make it through all of that, MORE additions to the Short Circuit 'verse are awaiting their turn to come online! Please share the campaign with friends and comrades you think will enjoy these little guys!!
Back both this campaign and Pods & Pots at a physical pin tier or higher, and you will receive two freebie pins - one by myself and one by Kage Davies!
Also back 3+ campaigns from the Animal Akademia banner at a physical pin tier or higher to receive free mini-pins from each! The reward from Soft Circuit is an exclusive miniature version of Pause.
Interested in customizing your pledge? In the Add-On section you'll find all the Soft Circuit items available to purchase one by one, so you can adjust your order as the campaign progresses while still taking advantage of pledge tier discounts. For Add-Ons with multiple choices,selection of which designs you'd like to claim will occur post-campaign via backer survey.
Shipping will be charged after the campaign ends as part of the Backerkit survey. Please note that the pledge amount during the campaign does not include shipping cost.
The following prices are general range estimates;actual shipping costs will be based on your specific location and the final package weight of your order.
Rewards will be shipped from the Netherlands. Backers are responsible for any customs fees, tariffs, or taxes that may be charged once your order enters your country. No refunds or replacements will be issued if your package is returned to sender or lost due to unpaid fees.
Shipments to the US are currently planned to be fulfilled DDP (Delivery Duties Paid), so tariffs will be paid up front with your other shipping costs and there should be no surprises at the door!
Custom tariffs will be a % of the physical value of your order total. Every purchase is bundled with a digital artwork file featuring that design, which will be emailed to you at fulfillment time! This is valued at €30 for plush designs, €10 for pin designs, and €6 for sticker artwork, meaning the physical value of these items for shipment purposes will be reduced by that amount.
The following full project timeline is an estimate based on the process of my previous projects, observing other small artists working with plush, and quotations offered by my suppliers. This is a thoroughly padded estimate: plush are a lot more involved to prototype than pins, and I will take whatever time is necessary to make sure your new friends are absolutely perfect!!
Pin and sticker only orders will fulfill sooner than this (estimated August-September 2026).
Any deviations from this projection will be communicated via updates in the Community tab and emails sent out to backers!
Hey there! My name is Anya, also known to various fandom and online spaces as "Chinny" and "CZGoldEdition". I'm a full-time freelance illustrator, concept artist, and merch designer raised in Appalachia and living in the Netherlands. Restarting my business across the ocean has been daunting, but backers like you made it possible! I made this move because the love of my life is Dutch, and of our two countries it's currently safer to establish our queer little family here.
This is my third Backerkit campaign, with my first completely fulfilled and the second currently in bulk production. My visa is based on my small business, and I'm extremely grateful to have the opportunity to design little guys and have them produced for you all to enjoy, especially in these uncertain times. I hope they bring you as much joy as I experience creating them, and with your support we can continue to explore this concept and beyond! <3
Backerkit is a crowdfunding platform that empowers you to help make ideas into reality! It functions as a sort of pre-order, allowing creators to gather the funds needed to produce items that are in turn sent along to the backers of their campaigns.
You won't be charged until the campaign ends. Take advantage of that to claim your early bot rewards! If you need to lower or cancel your pledge later, you can do so any time before pledges are processed to avoid being charged.
Designs will be unlocked as stretch goals are hit, meaning they have been fully funded and will be put into production at the conclusion of the campaign! Pledge with whatever designs you’d like in mind to increase its odds of being unlocked, and then check back before the campaign ends to adjust if a design you wanted was not reached.
Surveys will be sent out after the campaign’s conclusion for you to pick which designs you would like. Once finalized you can continue to edit your order via Backerkit until orders are locked.
Updates on production and fulfillment will be sent to your Backerkit email and posted in the Community tab on the campaign page.
In addition to my phenomenal cross collaboration partner and the other artists of Animal Akademia, I encourage you to check out the following projects - included in this stack of wonders are pins and plushies of robots, monsters, cuddly critters, and curiosities that are sure to delight, all designed by amazing artists!
📌 Pintopia 2026
Pintopia 2026 / Pins • Plushies • Ita Bags
This project is participating in the BackerKit event Pintopia 2026, a celebration of enamel pin, plushie and ITA bag project featuring an all-star lineup of creators crowdfunding together from January 22 – February 12, 2026.
Animal Akademia
Welcome to Animal Akademia - a celebration of animal science and sci fi! Please browse our curated selection of oddities, curios, specimens, and stories. Godspeed on your pursuit to research and understand the wonders of the animal kingdom and beyond!