Community
Join the conversation and share your thoughts
Community Leaders
Become an active participant Learn more
Invested in BackerKit’s future during our Wefunder campaign
Project Update: All Bags have Shipped!
Regarding additional B & C Grades from the first problematic production bulk, I need to finish reviewing my remaining new bulk inventory with my grading system. Then after I take standard stock photos, the extra inventory will be posted up on the webshop. This will hopefully be sometime late October/early November.
Once more, thank you so much for supporting this campaign! Please feel free to tag me on social media or to send any feedback my way. These are my brand's first leather bags so I'm definitely open to any thoughts, comments, or opinions you might have. If you're satisfied with your bag and looking to add another to your collection, I recently launched a campaign for a leather star shaped bag that can be seen here. I hope everyone receives their pledges safely and I really hope you all love your bags and wallets! Take care! :)
Invested in BackerKit’s future during our Wefunder campaign
Invested in BackerKit’s future during our Wefunder campaign
Project Update: Bulk Remakes Completed
Here are photos of the new bulk:
The heart bags have been fixed and the handles all have new custom made diamond nails that aren't tarnished like the previous ones.
The heart straps have all been completely remade to better reflect my sample version.
They actually offered to remake the wallets for me too so those have also been remade without the stitching issue in the lining.
I will update again once the bulk arrives to me and I've been able to review for the shipping quotes. Thanks again for your patience during these hiccups!
Invested in BackerKit’s future during our Wefunder campaign
Project Update: Bulk Review & Remakes
Additionally, the heart straps were accidentally assembled with the wrong thickness of leather, making them thinner than intended. Normally, this could be okay but because the strap is meant to be a coin purse and also has a zipper, the thicker leather is necessary to avoid heavy internal imprinting in the leather.
Unfortunately, this means the bulk of the heart bags & heart straps need to be remade so shipment will be pushed around another 2 to 3 months. But now that I have the completed bulk, I can begin to calculate accurate shipment quotes so I'll be doing that over the next few weeks to give shipping costs and update the Backerkit surveys. The current problem bulk will be sold in the future as B Grades & C Grades at a lower price point but only after the new bulk is completed and shipped out to backers.
In good news, the wallets came out mostly perfect. The colors are nice and appealing and the wallet quality is very durable. There's a new cotton lining inside to match the bags as well. There is one small flaw with the lining however. During the production, the brand labels were sewn in the wrong location for heart straps in a way where the label was peaking through the leather. They were moved to the correct location but instead of throwing away and wasting the lining, my manufacturer decided to recycle it for the wallets. This resulted in the wallets having some stitching holes in one of the pockets of the wallet. I'm not super happy with this problem but I understand why it happened and would rather them save the material instead of throwing it away over a small mistake. Additionally, it's in a location that cannot be seen so I think it would be wasteful to remake all the wallets. I have attempted to reduce the appearance of the holes as well. However, I know this might be disappointing for some people who are expecting a 100% perfect product so if you ordered the wallet and will be unhappy with this flaw, please contact me so we can arrange for an exchange for a heart strap or a refund. It is not possible for me to charge shipping only for the wallet orders so they'll be held until the other products are remade.
I'm so sorry if this has disappointed anyone. It's the unfortunate reality of manufacturing sometimes. Small things can happen that can completely affect everything and even when the product is complete, it can be damaged later. We will be remaking these and making sure to include heavier packaging material to protect everything during shipment to me. Instead of an earlier shipping date, it looks like we'll be reaching the original estimated September timeline from the campaign. I'll be sure to give new updates as the new production is made. Thank you for your trust and patience.
Invested in BackerKit’s future during our Wefunder campaign
Project Update: Production Begins!
As a fun tidbit, here's what colors were most popular in order: Black, Pink, Lavender, Red, Dark Pink
Thanks again everyone, looking forward to sharing more updates!
Community Leaders
Become an active participant Learn more