Project Update: Post-Campaign Update #3
Hi, everyone!
It's been a little less than a month, but things are moving along quite nicely.
1) Most excitingly, the print run has since commenced and been finished. Boxes have been assembled and prepped for shipping (pictures attached). Note my company name on the shipping boxes, this'll also appear on the back of the game boxes!
2) Shipping is planned for later this week. The ETA for the boxes is mid-to-late March, as shipping from China takes somewhere between 6 weeks and 2 months, per the printer's estimate. The good news is that they beat the Spring Festival goal, so there won't be a delay due to that. This all means that we should be able to meet the May/June target for delivery of the games to backers.
3) There will be some time needed in between to assemble the games, as some of the printing is being done locally. That is still next on the list, now that some other things have been dealt with, such as receiving the boxes of playing cards (for the basic and deluxe game), and ordering the medieval coins (for the incentives and deluxe version).
4) My goal is to have the surveys out sometime in February, as I realized there is an approval process and some other steps to go through. So be on the lookout for those!
Thanks again!
Joe
It's been a little less than a month, but things are moving along quite nicely.
1) Most excitingly, the print run has since commenced and been finished. Boxes have been assembled and prepped for shipping (pictures attached). Note my company name on the shipping boxes, this'll also appear on the back of the game boxes!
2) Shipping is planned for later this week. The ETA for the boxes is mid-to-late March, as shipping from China takes somewhere between 6 weeks and 2 months, per the printer's estimate. The good news is that they beat the Spring Festival goal, so there won't be a delay due to that. This all means that we should be able to meet the May/June target for delivery of the games to backers.
3) There will be some time needed in between to assemble the games, as some of the printing is being done locally. That is still next on the list, now that some other things have been dealt with, such as receiving the boxes of playing cards (for the basic and deluxe game), and ordering the medieval coins (for the incentives and deluxe version).
4) My goal is to have the surveys out sometime in February, as I realized there is an approval process and some other steps to go through. So be on the lookout for those!
Thanks again!
Joe