🚀
Project Teasers
Sneak peeks of upcoming projects.

Highlights

LexNBM
CREATOR
20 days ago

Project Update: Production Update 5: This isn't healthy.

Friends of the truth, 

I have been working on this show like a madman. What I’m doing probably isn’t healthy, that’s the bad news for me. The good news for you is the following: all editing of the voice actors for all episodes is over. All FX and foley work for the first six episodes is done. And the first five episodes are completely done. Yes, mix, music, sound design; everything. They only have to be mastered. 
 
So, basically, I’m almost halfway done with the entire season, since there are thirteen episodes. 
 
If I don’t suddenly burn out on this editing and composing marathon and need a break to keep enough distance, you guys may get the season around the beginning of December. 
 
Enough typing, I have frantic music making to do!
Lex  
0
Share

Share

Twitter

Facebook

Copy Link

Edit
LexNBM
CREATOR
about 1 month ago

Project Update: DECA 2 Production update #4

Friends of the truth,

Production is going great. Out of the 28 roles, 25 have been cast. The three remaining ones are very small roles, and even though I have been struggling to find the right voices, I’m going to push on and keep looking during editing/soundtracking/etc, if necessary.

The two leads are about 80% to 85% done with recording their parts, and I would say recording overall is around the 90% mark. Unless some unforeseen disaster hits, by the end of next month, I’ll be deep into editing the main structure of the episodes, and the month after I’ll be composing the soundtrack.

If all goes really really smoothly, and this is a bit of a stretch, you guys may have the whole season in your inbox around the end of this year. Fingers crossed.

If you want to see my progress in real time, check THIS document.

If you want to know anything about where I’m at with production, please reach out!

Thanks again,

Lex
0
Share

Share

Twitter

Facebook

Copy Link

Edit
¿Ha sucedido algo repentinamente que alteró sus planes de viaje con Lufthansa? No te preocupes. Lufthansa le facilita cambiar su reserva de vuelo. Ha ideado una política inteligente para realizar cambios en su reserva de vuelo actual para no tener que sufrir con sus planes de viaje debido a una situación no anunciada. La aerolínea ha facilitado el cambio de su reserva según su conveniencia.

¿Cuál es la política de cambio de vuelos de Lufthansa?
Si necesita modificar su vuelo de Lufthansa, la política ofrece flexibilidad con algunas condiciones. Podrás cambiar tu vuelo de forma gratuita si lo haces dentro de las 24 horas siguientes a la reserva. Más allá de este período, se aplica una tarifa por cambio, que varía según qué tan cerca esté el cambio de su hora de salida y el tipo de boleto que compró. Si su nuevo vuelo es más barato que el original, Lufthansa le proporcionará la diferencia en forma de un bono de viaje que podrá utilizar para futuras reservas. En cambio, si el nuevo vuelo cuesta más, tendrás que pagar la diferencia de tarifa. Revisa siempre estos detalles para evitar sorpresas y gestionar tus planes de viaje de forma eficiente.

¿Cómo cambiar un vuelo de Lufthansa online?
  • Vaya al sitio web oficial de la aerolínea.
  • Procede a la opción Gestionar mi reserva.
  • Menciona el código de reserva y tu apellido.
  • Haga clic en el botón Confirmar.
  • La pantalla mostrará los detalles de su reserva.
  • Selecciona el vuelo que deseas cambiar.
  • Haga clic en el botón Cambio de vuelo.
  • Continúe en la página siguiente y agregue fechas para su nuevo viaje.
  • Elija un vuelo para sus fechas preferidas y continúe.
  • Realizar el pago, si es necesario.
  • La aerolínea le enviará un correo electrónico de confirmación con los detalles de su nueva reserva de vuelo.

Opción Alternativa
Puede conectarse con un representante de servicio al cliente. Si necesita asistencia en español, llame al número Lufthansa Teléfono Gratuito para obtener servicios rápidos. Contacta con el equipo y soluciona tu problema cómodamente. Comparta sus datos de contacto y credenciales de reserva con el equipo de atención al cliente. Sin embargo, tendrá que pagar cargos por el servicio además de otros costos aplicables.

¿Cuánto cuesta cambiar un vuelo de Lufthansa?
Ahora que está familiarizado con los pasos para cambiar su reserva de vuelo con Lufthansa, es imperativo tener una idea de las tarifas que deberá pagar. Los costos oscilan entre $75 y $200. Sin embargo, dependen del tipo de billete, los destinos y el horario de cambio de vuelo. Si reserva billetes con Aegean Airlines, deberá ponerse en contacto con el equipo de atención al cliente. Puedes utilizar el número de Aegean Airlines España y completar el proceso de cambio de vuelo. Para hacer esto, deberá compartir la información de su reserva y seleccionar su reserva. El agente realizará todos los cambios necesarios en sus boletos aéreos programados.

Conclusión
El proceso de cambio de vuelo es sencillo y rápido, y la mayoría de las veces ni siquiera te cobra ninguna tarifa por el cambio. Entonces, ¿se enfrenta a una situación en la que tiene que cambiar su reserva de vuelo de Lufthansa? Continúe y realice los cambios necesarios. La aerolínea lo ha hecho flexible y amigable para el cliente. Deberá comunicarse con el servicio de atención al cliente si tiene alguna pregunta o inquietud relacionada con el viaje para completar el proceso de manera bastante eficiente.



0
Share

Share

Twitter

Facebook

Copy Link

To contact Facebook about a problem, users can utilize several avenues for assistance. One option is to visit the Facebook Help Center,+1-844-411-1214 accessible through the website or app, where users can search for solutions to common issues or access additional support options +1-844-411-1214.

How do I contact FB by phone. How can I talk to a real, live person on Facebook for assistance. Yes you can talk to a live person at Facebook. For assistance in contacting a live person at Facebook, you have several options. Firstly, you can reach out to our representative directly by dialing '+1-844-411-1214'. Alternatively, visit the Facebook Help Center using the contact numbers '+1-844-411-1214 You can also access your account and navigate to the "Support Inbox" or find the "Chat with a Representative" feature within the platform. Another convenient option is reaching out through the dedicated hotline at +1-844-411-1214. Certainly. To commence a dialogue with a live representative at Facebook, kindly adhere to these procedural steps. Access the Facebook Help Center via +1-844-411-1214 or 1-650-543-4800 and log in to your account. Subsequently, navigate to the "Support Inbox" or locate the option titled "Chat with a representative." Opt for the '+1-844-411-1214' option to facilitate direct assistance.

For personalized assistance, access a Facebook support representative through official channels. Visit the Facebook Help Center or click the 'Help' symbol in the bottom right corner of the screen. Alternatively, reach out to us at [email protected] for email support. For immediate assistance, please call +1-844-411-1214 to connect with Facebook Customer Service promptly. Also if you can follow these steps given below.

Certainly, here are steps to contact Facebook support:

1. Use Live Chat: Initiate a live chat by clicking on the chat option if available in the Help Center.

2. Email Support: Compose a detailed email describing your issue and send it to [[email protected]](mailto:[email protected]).

3. Call Customer Service: Dial the Facebook support hotline at +1-844-411-1214 for immediate assistance.

4. Direct Messaging: Consider reaching out through direct messaging on Facebook's official social media accounts.
0
Share

Share

Twitter

Facebook

Copy Link

LexNBM
CREATOR
3 months ago

Project Update: DECA 2 Production Update #3

Hi Friends!

In this month’s production update, nothing but good news.
Out of the 28 roles, 20 have been cast, which includes all major and medium ones. That means casting is about 90% done. The leads are still working on recording their parts, one of them is making great headway. I would say about 50% of the lines are recorded.

Last month, I struggled to get in touch with one of the leads. It came up to the point where I worried about his wellbeing a little bit and also about the production of the show as a whole – him being the one with the most lines by far. But, turns out, all is well. And he’s starting to record his episodes as we speak. This is a huge weight off my shoulders, and it means the schedule won’t change that much! Great news.
 
I suspect to have about 70 to 80 percent of the show recorded by the end of next month, and then to start editing the month after. I’ve decided to hire help with editing for the first time in my career. I like to be really hands-on, but just to keep this from going for too long, I’ll have an editor helping me build the foundation of the episodes and editing all my foley work. That should speed things up. I’ll still do the ‘creative’ work like soundtrack work or FX, etc. and also the final edit.

If you want to see my progress in real time, check THIS document.
If you want to know anything about where I’m at with production, please reach out!

Thanks again,
Lex
0
Share

Share

Twitter

Facebook

Copy Link

Edit
Hi Friends of the truth,

In this month’s production update, nothing but good news.
Out of the 28 roles, 20 have been cast, which includes all major and medium ones. That means casting is about 90% done. The leads are still working on recording their parts, one of them is making great headway.

Last month, I struggled to get in touch with one of the leads. It came up to the point where I worried about his wellbeing a little bit and also about the production of the show as a whole – him being the one with the most lines by far. But, turns out, all is well. And he’s starting to record his episodes as we speak. This is a huge weight off my shoulders, and it means the schedule won’t change that much! Great news.
 
I suspect to have about 70 to 80 percent of the show recorded by the end of next month, and then to start editing the month after. I’ve decided to hire help with editing for the first time in my career. I like to be really hands-on, but just to keep this from going for too long, I’ll have an editor helping me build the foundation of the episodes and editing all my foley work. That should speed things up. I’ll still do the ‘creative’ work like soundtrack work or FX, etc. and also the final edit.

If you want to see my progress in real time, check THIS document.
If you want to know anything about where I’m at with production, please reach out!

Thanks again,
Lex
0
Share

Share

Twitter

Facebook

Copy Link

Monthly production update #2
 
The second month of DECA 2 production is over and there’s been lots of great progress and a big potential setback.
 
Just like last month I’m mainly casting roles and directing their parts. For those who missed last update: the way I work is recoding all parts first. After having all the different monologues and one-sided dialogues ready I start editing all the puzzle pieces together into a first edit of the main structure.  If punch in recordings are needed, I request them after the first round of editing. So, first phase is casting and directing performances.
 
This season has a cast of 28 voice actors. Last month, I made great headway by recording lots of supporting roles. This month has been mainly about the two leads. I’ve finished the first five episodes with the female lead. She’s doing a great job, I’m so lucky Lyndsay is a part of this project! A bit of a setback has been that I’m unable to get in touch with the male lead. I do hope everything is okay on his end. From a production standpoint this is a major setback. It took me months to find the right voice and I didn’t even want to start the crowd funding before locking in that role. It’s not a problem that’s unsolvable. If we don’t start recording this month, I’ll start looking for someone else and shift the production schedule accordingly.
 
I suspect we’ll have almost all voices expect for the male lead recorded at the end of next month. If we do find another lead quickly, I hope to start editing in October!
 
If you want to follow along more closely, join my production overview file HERE. And if there’s anything you’d like to know, just shoot me a question!
 
Talk soon,
Lex  
0
Share

Share

Twitter

Facebook

Copy Link

LexNBM
CREATOR
5 months ago

Project Update: DECA 2 Production Update

The first month of DECA 2 production is over. And I think it's been a very good one. 

EDITING THE SCRIPT
Right after the crowd funding campaign funded, I started going through the script again. I had a lot of very good feedback from beta readers and some of my friends and family that always have great constructive feedback. It took rewriting it twice to get it to the final point. Especially the ending got a lot of overhauls and I think the script is now on version 8. But I feel very confident about it . Weirdly enough, season 1 also took 8 versions... 

CASTING & DIRECTING
Then casting and recording started. I don't record chronologically, but per role. So I really get into one role, try to find the perfect actor for that part and record that performance. Once I feel really confident about the performance and consider it a wrap, I move on to he next one. It won't come together into cohesive episodes until all the individual parts are on tape. That proces can be very, very slow, but it's the only way for me to get it right without drowning in the project. And I think I've been able to make a lot of progress. The casts consist of roughly 27 different voices - ranging from the lead to the very small three line supporting parts. And now, I've finished 10 of those in about two and a half weeks. Some of which were parts I was very nervous about getting to work. So, I'm very happy with that! I'm hoping to keep this momentum going next month.

PRODUCTION OVERVIEW DOC
I'll end this with a reminder that you can check on my real-time progress anytime, by checking out THIS doc. You will see the episodes titles - just a warning in case you want to go in completely without spoilers.

I'll write up the next update in a month, hopefully having recorded (almost) all the performances!
Lex 
0
Share

Share

Twitter

Facebook

Copy Link

Edit
LexNBM
CREATOR
5 months ago

Project Update: Link to DECA 2 Production Overview Document

Hi Friends, 

As the crowd funding is wrapping up and rewards are going out, production is in full swing. I've finished the fourth and final version of the scripts and I'm in the middle of casting now. 

I'll be writing up a short production update the first of every new month, but if you want to keep track of my progress in real time, below you can view my own personal overview doc for the entire production timeline. 

Very very mild spoiler warning: the overview mentions all the episode titles. I don't really think they give away too much, but if you want to go in completely unknowing, don't click

https://docs.google.com/document/d/1oZS5Fm7C11zTSOBVUa2UrQsKTRGE8Loez6VlXZp9B6U/edit?usp=sharing

Talk soon!

Lex

0
Share

Share

Twitter

Facebook

Copy Link

Edit
LexNBM
CREATOR
6 months ago

Project Update: Rewards being shipped + Production updates

Supporters of the truth, 

I'm working hard behind the scenes to get all of your rewards to the right place and start up production. 

If you haven't filled in your survey, please do so asap. I'm shipping  rewards today and tomorrow, so if you haven't received all of your digital and/or physical rewards in the next two or three weeks, please reach out to me. This excludes the hall of fame mention, the DECA 2 season itself, behind the scenes episodes and producer credits. Those rewards will go out once production has wrapped. 

Speaking of production. Starting July first, I'll give an update every month on production status. I will also share a link to my production overview and planning doc, so you can check my progress on each step of the proces. If at any time during production you have any questions, please feel free to reach out. 

Thanks again, everybody and let me know if something seems wrong or missing.

Lex 

0
Share

Share

Twitter

Facebook

Copy Link

Edit